Before any planks are cut, we recommend consulting with a Flooring Oxnard professional. This stage will set the foundation and the tone for a successful installation project. This involves measuring the space, discussing your vision, and selecting the appropriate hardwood.
This is something that is not really talked about, but hardwood flooring must acclimate to your home's environment to prevent future warping or gaps. This process involves storing the wood in the installation area to adjust to the room's temperature and humidity levels.
Here is what OldeWood Limited has to say "Acclimation times vary by species and product, but a rule of thumb is to acclimate wood floor products for at least three days. You’re trying to reach an equilibrium between the moisture content of the wood materials and the air where the product is being installed."
The first step involves removing existing flooring and ensuring the subfloor is clean, level, and ready for installation. This is a very important part of the process, as you do not want to have unleveled floors or squeaky ones for that matter.
The core phase of the project involves hardwood flooring contractors meticulously installing each plank, ensuring alignment, stability, and aesthetic appeal. Now, for the most part, most of the cutting of the hardwood floor should have been done, but on some occasions, a re-cut is needed to fit the wood perfectly at those angles.
Applying the finish to the hardwood is vital for protection and longevity. Options include oil-based polyurethane, water-based polyurethane, or natural oils, each requiring different drying times.
Larger areas and rooms with intricate layouts or numerous corners will extend the installation time; the more square footage the cover, the more time it takes. Oxnard Flooring excels in efficiently navigating these challenges.
Pre-finished hardwood flooring can expedite the process, as it's ready to walk on immediately after installation. Unfinished hardwood, however, requires on-site finishing, adding to the timeline. There is more that goes into this, but we will save that for another blog spot, so stay tuned.
Removing old flooring can uncover issues that need addressing before installing new hardwood, or any floor for that matter. There could be a need for subfloor repairs or leveling, potentially extending the project duration. Again, this is crucial, so coordinate with your hardwood flooring contractor.
Phase | Duration | Notes |
---|---|---|
Consultation & Planning | 1-2 days | Selection of materials, design discussion |
Acclimatization | 3-7 days | Hardwood adjustment to home environment |
Area Preparation | 1-2 days | Removal of existing flooring, subfloor prep |
Hardwood Installation | 1-5 days | Based on room size and layout complexity |
Finishing Touches | 1-3 days + drying | Application of finish, additional drying time |
Embarking on the installation of hardwood floors is a decision that marries aesthetics with practicality. While the process requires time, the outcome—a stunning, durable floor that elevates your home's appeal—is undoubtedly worth the wait. Oxnard Flooring Installation and flooring professionals are your allies in this journey, ensuring every step is executed with precision and care. By choosing a reputable wood flooring service, you're not just updating your home but investing in its future beauty and functionality.